metalist.jpg«Metallist» football club office (northern tribunes) in Kharkov is finished. Site’s area is 1.400 m². The list of the executed works included main construction, design (all sections), mounting works on ventilation and air-conditioning systems installation, heating, electrical mounting (more…)


aval.jpg
02 9 11 15

4 14 13 3


aval.jpgOn November 30, 2007 new Raiffeisen Bank Aval head office in the business centre “Parus” was finished. Its area is 3100 m² (4,10 floors). “Alsta” was a managing company, TRK was a contractor company as to all building and engineering works performed (more…)


aval.jpgIn April 2008 “Niko-Finance” offices located at Grushevsky Str., 9а, and Vladimirskaya Str. (in the business centre «Leonardo»). were finished. TRK was a general contractor.  The sites’ area is 480 m ². Design, installation and wiring work, (more…)


alfa.jpgOn March 29, 2008 “Alpha banks” offices located at Moscovsky Avenue, 9 and Desyatinoy Str., 4/6 were put into service. Sites’ area is 4.050 m². TRK was the general contractor. In the course of work installation and wiring works, (more…)


aval.jpg

1.jpg 2.jpg 3.jpg 4.jpg 5.jpg

6.jpg 7.jpg 8.jpg 9.jpg

13.jpg 14.jpg 15.jpg


aval.jpg

11.jpg 21.jpg 31.jpg 41.jpg 51.jpg

61.jpg 71.jpg 81.jpg 91.jpg 10.jpg


alfa.jpg

22.jpg 32.jpg 42.jpg 52.jpg 62.jpg

72.jpg 82.jpg 12.jpg 92.jpg 101.jpg


henkel.jpg

16.jpg 4v.jpg 6.jpg 23.jpg

1.jpg 2.jpg 3.jpg 5.jpg

azinger.jpg
121.jpg 228685.jpg 312953.jpg 541085.jpg
715728.jpg 897294.jpg 1023988.jpg